Highlighted Construction Projects

Learn about current construction projects happening in your neighbourhood and around Chilliwack.

Future, current and upcoming projects can be viewed on our GIS Mapping System at https://maps.chilliwack.com/b/?layer=45 

For monthly email updates about transportation construction projects, subscribe to our e-newsletter.

Active Transportation Design Project

Civil and electrical engineering detailed design for implementation of active transportation improvements adding to improve cycling facilities and safety in a cost-effective manner.

Bridge Inspection Program

Bridge inspections are required to be completed by a qualified bridge inspection engineer to visually inspect each of the City's bridges including ancillary structures.

Chilliwack River Road - Active Transportation Infrastructure

The City of Chilliwack and Tzeachten First Nation jointly applied to the BC government for Active Transportation grant funding. The project will include a multi-use pathway, a rectangular rapid flashing beacon and improvements to drainage and streetlighting.

Crosswalk Improvements - Rectangular Rapid Flashing Beacons (RRFB)

Rectangular Rapid Flashing Beacons at Crosswalks

Culvert Projects

Culvert replacements and upgrades are needed to avoid failures that could cause costly repairs and interruptions to traffic. Culvert failures can cause damage to the surrounding riparian environment.

Emergency Sewage Outfall Repair

Emergency sewage outfall repair was contracted to Jakes Construction and work is planned to begin at the end of January. Environmental monitoring will take place throughout.

LED Streetlight Conversion Program

LED Streetlight Conversion Program to reduce energy and maintenance costs

Mary Street Corridor Improvements (Hodgins Ave to Wellington Ave)

Improvements will include buffered bike lanes, an RRFB installation at Kipp Avenue, conversion of angled parking to parallel parking and new LED lighting.

Paving Program

Each year the City of Chilliwack tenders asphalt rehabilitation work for various roads to maintain the driving surface and reduce maintenance costs.

Railways in Chilliwack

Learn more about upcoming railway repairs this spring. Canadian National Railway (CN Rail) and Southern Railway (SRY Rail link) operate two railway lines within the City of Chilliwack.

Roadway Markings Program

Every year the City takes inventory for line markings that need painting and the City's contractor completes the work.

Teskey Detention Pond in Bridlewood Park

The Teskey Detention Pond located in Bridlewood Park was originally constructed in 1997 to manage rainwater flows with increasing development in the Promontory area.

Tyson - Keith Wilson Design-Build Project

Works will include widening, storm main upgrades, drainage works, streetlights, curb, sidewalk and bike lane construction.

Utilities Upgrade Projects

Information about current water and sewer upgrade projects.

Victoria Avenue Parking Lot

The City will be building additional parking capacity downtown, north of Victoria Avenue, this summer.